    1. Standby proposed structural wall opening, overhead lintel and plinth (optional).

  • SLIDE & HIDE System (S) Pte Ltd.

    2. Unpack and standby SLIDEHIDE casing for installation.

  • SLIDE & HIDE System (S) Pte Ltd.

    3. Anchor the SLIDEHIDE casing within the structural opening. The gaps between the track/casing and brickwall will be grouted with cement-sand.

  • SLIDE & HIDE System (S) Pte Ltd.

    4. Cement-sand render is trowelled onto the brickwall and steel casing surface. Lay fine-mesh along the grouted cement-sand to minimize plaster cracks.

  • SLIDE & HIDE System (S) Pte Ltd.

    5. After floor and wall finishes is completed, standby to fix door frame and door panel.

  • SLIDE & HIDE System (S) Pte Ltd.

    6. Installation sequence is comple- ted.